The Metropolitan Advantage

Multi-Family / The Metropolitan Advantage

Metropolitan’s multi-family team has worked hard to put the right processes and procedures in place to ensure a positive experience for our clients – that’s the Metropolitan Advantage.

We build everything here on your timeline – you receive product only when you need it onsite. Additionally, all material is shipped with labels corresponding to each individual unit. Scheduling or job site changes are not an issue with our staff – we react quickly and without delays.


Range of cost sensitive cabinetry to fit the needs of varied project types

Capacity and expertise to supply cabinets for projects ranging from a two-family home to a large residential apartment building

Comprehensive set of shop drawings generated from the architectural plans provided by design team

Quickly react to changing field conditions as a local manufacturer

Cabinets are CARB Phase II compliant & KCMA Certified, ULEF material available for cabinet manufacturing, as well

Shipment deliveries are able to be staggered for convenience 

Each cabinet labeled with size and unit number for organization during installation